Every project I have regretted started the same way: with a blank artboard and a deadline. Every project I am proud of started with a notebook and a lot of questions. So the first three days of a job are now fixed, and no amount of enthusiasm — mine or the client’s — is allowed to shorten them.
Day one: questions
I ask more than I need. Who is this for, and who is it definitely not for? What already exists, and why does it fall short? What would make you cancel this project halfway through? The last one gets the most honest answers.
I write everything down verbatim. Paraphrasing at this stage loses the phrases people actually use, and those phrases usually end up in the work.
Day two: the wall
References go on a wall — a real one, or a very large canvas. Not “inspiration”; evidence. Every image has a note that says what it proves:
- too polished — they’ll feel sold to
- this is the right amount of white space
- the type is doing what the photography can’t
By the end of the day the wall usually splits into two or three directions. Anything that does not belong to one of them comes down.
Day three: one sentence
The last day is spent writing a single sentence that describes the finished thing. It has to be specific enough that two designers, given the sentence alone, would make recognisably similar work.
A small, quiet identity for a roaster who would rather talk about farms than about coffee.
That sentence goes at the top of every file, every deck, and every email for the rest of the project. When a decision is hard, we read the sentence.
Why this matters
Software is fast. It is so fast that it will happily let you make forty variations of the wrong thing before lunch. The notebook is slow on purpose. Three days of slowness at the start have saved me weeks of speed in the wrong direction — every single time.